A manufacturing job can look perfectly planned. The customer has placed their order, production has been scheduled, materials have arrived and the team knows what needs to be made.
Then, as the job approaches completion, somebody discovers that a component is missing.
It may not be particularly expensive or complicated, but without it the finished product cannot be dispatched. Suddenly, the delivery date is in doubt, other jobs may need rescheduling and somebody has to explain the delay to the customer.
How did something so small become such a significant problem?
Sometimes the answer lies in how the bill of materials was structured and whether the business had an accurate picture of what was actually available.
A BOM is more than a list of parts
At its simplest, a bill of materials (BOM) identifies the components and materials needed to manufacture a product. But in businesses producing complex or bespoke products, the information needs to do considerably more than that.
A finished product might contain components that need to be machined, welded, heat-treated or assembled before they can be used. Some parts are purchased from suppliers, while others are manufactured internally. Certain components may also be used across several different products.
So knowing which parts are required isn’t necessarily enough. The business also needs to understand what has to happen to those parts and when they need to be available.
This is where sub-assemblies become important.
Imagine a simple metal component requiring one straightforward operation before being fitted to the finished product. It may be perfectly sensible to include it directly in the parent BOM.
Now consider another component that requires several manufacturing stages, perhaps machining, welding and finishing. It might also be used in several different products.
Creating a separate sub-assembly can make those manufacturing requirements more visible and easier to plan.
As Stephen Rendall explains in The Manufacturing Playbook, the decision should reflect how the manufacturing process actually works rather than relying on an arbitrary rule about the number of parts or operations.
The objective is to make the component requirements and manufacturing steps clear, not to introduce unnecessary complexity.
The danger of assuming something is available
Consider a manufacturer that promises a customer delivery within five days.
The finished product requires a particular sub-assembly, and the planning information suggests it is available. But the stock record is inaccurate.
In reality, the sub-assembly still needs to be manufactured, involving several operations and potentially different machines and employees.
The business has now committed to a delivery date without allowing for the work needed to produce one of its components.
This can be particularly costly when the missing part isn’t discovered until assembly or finishing. Production may have to stop, another job may be interrupted and the customer may face a delay.
The issue isn’t necessarily that the business lacks the capability to make the product. It’s that the information used to plan the job didn’t accurately reflect what needed to happen.
Before making a delivery commitment, manufacturers therefore need reliable answers to some basic questions. Are the required components available in the correct quantities? Does anything need to be manufactured first? If a sub-assembly is missing, how long will it take to produce?
These are straightforward checks, but they’re only as reliable as the underlying BOM and stock information.
Does the BOM reflect how the product is actually made?
There is another complication. A manufacturing structure can look perfectly logical on paper while creating problems on the shop floor.
Stephen describes an example where an operation appeared too early in the manufacturing sequence. Once the component had undergone heat treatment, subsequent work became more difficult.
Feedback from the manufacturing team helped identify the problem and led to a revised sequence.
This illustrates why the people carrying out the work need a route to influence the information used to plan it.
An engineering drawing or manufacturing route may appear correct, but does it reflect what happens in practice? Are the operations in the right order? Are there machine limitations or practical constraints that haven’t been considered?
The people doing the work often know the answers. The challenge is making sure that knowledge is captured and reflected in the manufacturing information.
Start with the jobs that cause the most disruption
If missing components and late-stage delays are becoming familiar, start by reviewing the products that cause the most problems.
Look particularly at jobs involving multiple manufacturing stages, components used across several products and products where material availability regularly causes delays.
Check whether sub-assemblies are structured consistently, whether stock information is accurate and whether manufacturing sequences reflect the real process.
Then talk to the people using that information. Where do they regularly have to stop and ask questions? Which components are frequently missing? What workarounds have become normal?
The objective isn’t to make the BOM more complicated. It’s to make the information more useful.
A well-structured BOM should help production planners schedule with greater confidence, give operators the information and components they need, and support delivery promises based on what the business can actually produce.
One of the simplest signs of progress may be hearing fewer people say, “I’m waiting for that part,” or “We haven’t got enough of these.”
Because a reliable BOM isn’t just about having the correct component list. It’s about making sure the whole job can move through the factory without unnecessary interruptions.